SKU:159926293
Control Unit 12V
Free Shipping on orders over $50
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 11 - Jul 16
Description
Control Unit 12VThis control unit is used only on the D5LC and D5L Espar heaters
This combustion burner tube can get carbonized after several years of use
D8LC to adapt older style harness to the new type of FMP connection
Built-in altitude compensation up to 4
This flange connects to 90mm/3
and D4L (Series) - 25
no separate diesel supply needed
This blower cover seal has a tendency to crack
this 12V unit provides up to 42
000 BTU / 12 kW
Heater an be mounted at different angles improving mounting flexibility
This 12 Volt blower motor is used in the 25
season after season
Easy Shipping
Quick Dispatch:
Your Control Unit 12V orders ship within 1-2 business days.
Delivery Options:
- Standard: 3-7 business days
- Fast: 2-3 business days
- Express: 1-2 business days
Order Tracking:
You'll receive a tracking link by email once your Control Unit 12V ships.
Need Help?
Questions about Control Unit 12V, sizing, or delivery? We're just an email away.
Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Control Unit 12V in your area.
Get Shipping Estimates
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
Control Unit - D4 (24v)
247.20
★★★★☆4.8 (126)
Outlet Hood Straight 90mm (3.5") Outlet - All Airtronic 4kw Heaters
17.90
★★★★★4.9 (98)
#76 NO TITLE
50.00
★★★★★5.0 (157)
CAMPING TRAILER LAPEL PIN
10.00
★★★★★4.7 (84)
Honeywell North Cartridge Filter, Organic Vapor, Acid Gas, P100 (pair)
28.00
★★★★★4.9 (203)
Flexible Air Intake Hose - 20mm x 1mtr
38.32
★★★★★5.0 (176)
RPB Nova 3, Nylon cape, Breathing Tube, Flow Control (each)
338.90
★★★★★4.8 (132)